Sabzab Rey Crude Oil Pipeline
Sabzab Rey Crude Oil Pipeline

 

                          Client :

 

   Energy-Gostar/National Iranian Oil Engineering and Construction. And Const. Company

www.nioec.ir

             Description :

   Construction of 630 km Pipeline to transfer sour crude oil with different sizes (30”/ 26” / 18”)

    Project Location :

   Sabzab to Rey

SEP Scope of Work :

   Basic Design, Detail Design Engineering and Procurement Services

                          Status :

 

   Completed