Client : Shahrekord Carbon Dioxide Company (SCD) / Kermanshah Petrochemicals Industries Company (KPIC)

Description : Installing New plant for recovery of CO2 from Ammonia Reformer Flue Gas, under License of SCD

It is desired to use the recovered CO2 in the Urea production section for increasing the urea yield by 5%

The new plant includes Washing and Cooling section, Absorbing Section and Stripping Section.

Each section has a variety of equipment like Columns (up to 41m height and 3.8m diameter),

Exchangers (S&T, Plate Type, Reboiler, …), Reclaimer, Vessels, Pumps, Blowers, Tanks, etc.,

as well as Piping up to 50″.

Project Location Kermanshah (Iran)

SEP Scope of Work Basic Engineering Completion, Detailed Design Engineering, Technical Procurement Services and Technical Assistance 

Status : Completed