Client : Qeshm Oil Investment Company (www.qoic.ir)

Description : Constructing new Oil Terminal in Qeshm Island containing 6.5 million barrels storage capacity and  and other facilities for loading / unloading the marine vessels with capacities upto 323.000 dwt.       including the following systems :

                                            ONSHORE Facilities

– 13 Floating Roof Storage Tanks (6.500.000 barrel   total storage capacity)

– 8000 m3/hr pumping capacity

– 2 x 8 km onshore 36″ pipelines

– 25 km HV Power Transmission Line

– Buildings (including Control Room, Substations, Laboratory, GIS,    Workshop, Warehouse, Firefighting, etc.)

  OFFSHORE Facilities

  – 2 x 4 km Subsea 36″ pipelines

 – SPM, 4 km away the shore line

  – PLEM

   – Sea Water Intake System

   – All needed facilities for loading/unloading to/from marine vessels

Project Location : Qeshm Island (South of Iran) 

SEP Scope of Work : Project Management Consultant (PMC) for Engineering, Procurement, Construction and Commissioning stages of Project

Status : 6 Tanks, 25 Km HV Power transmission and sea water intake system were completed and other facilities will be done in the next phase.