Client : Petro Aram Co. / National Iranian Oil Products Distribution Company (NIOPDC) www.niopdc.ir
Description : Installing new facilities in the existing Gorgan Oil Depot like :
– 1 x 20.000 m3 Storage tank
– Loading/Offloading Pumps
– Loading Arms
– Interconnection Piping
– Electrical Systems like Cathodic Protection, …
– Instrumentation and Control Systems
as well as installing or Revamping the following systems for whole existing facilities :
– Firefighting Systems
– F&G System
– Radar Tank Gauging
– Buildings
– API Separator
– etc.
Project Location : Gorgan (North of Iran)
SEP Scope of Work : Detailed Design Engineering, Procurement Services and Technical Assistance during Construction and Installation
Status : Completed