Client : Iranian Gas Engineering and Development Company

Description :  

  – Construction of 94 km 56” transmission pipeline   along   from Iranshahr to Cheb, a 56” pig launcher in IRANSHAHR   launcher/receiver station and 3 LBV stations.

  – Replacing 30 km of existing 56” IGAT7 gas   pipeline   from Bampoor station to Iranshar receiver station   with a 30”   pipeline, Installation of 30” pig launcher in Bampoor   launcher/ receiver station and a 30” receiver trap at   Iranshahr receiving station.

Project Location : Iran Shahr to Cheb, Sistan and Baloochestan Province

 SEP Scope of Work: Detailed Design Engineering

Status :Remedy of defects period.