Client : Iranian Gas Engineering and Development Company
Description :
– Construction of 94 km 56” transmission pipeline along from Iranshahr to Cheb, a 56” pig launcher in IRANSHAHR launcher/receiver station and 3 LBV stations.
– Replacing 30 km of existing 56” IGAT7 gas pipeline from Bampoor station to Iranshar receiver station with a 30” pipeline, Installation of 30” pig launcher in Bampoor launcher/ receiver station and a 30” receiver trap at Iranshahr receiving station.
Project Location : Iran Shahr to Cheb, Sistan and Baloochestan Province
SEP Scope of Work: Detailed Design Engineering
Status :Remedy of defects period.