Client : EHSAN JV / National Iranian Oil Engineering And Construction Company (NIOEC)
Description : Installing New Utility and Offsite facilities in the existing Tehran Refinery in order to support the new installed
process units like GHT, KHT, NHT/CCR, H2P , etc. The main new Utility and Offsite facilities are as follows:
– 5 x 20,000 m3 Storage Tanks for new products, in addition to relevant pumps and all fire fighting systems
– 1 x 3000 m3 Spherical Tank with relevant pumps and Refrigeration System
– Flare System
– Process and Utility Interconnection pipes and interfaces
– Fuel System
– Natural Gas System
– Instrument Air System
– Condensate Removal System
Project Location : Shahr-e-Rey
SEP Scope of Work : Detailed Design Engineering, Procurement Services and Technical Assistance during Construction in all engineering
disciplines
Status : Completed