Client : National Iranian Oil Engineering And Construction Company (NIOEC)
Description : Installing New Process, Utility and Offsite Units in the existing Bandar Abbas Refinery in order to increase
premium gasoline output and upgrade diesel fuel capacity. The main new units are as follows
– 25,000 bpsd Heavy Naphtha Hydrotreater
– 16,000 bpsd Light Naphtha Hydrotreater
– 25,000 bpsd Catalytic Reformer (CCR)
– 50,000 bpsd Gasoil HDT Unit
– 110 ton/day Sulfur Recovery Unit
– 200 ton/day Amine Gas Treating Unit
– 1800 ton/day Sour Water Stripping Unit
– 15 different size storage tanks for intermediate or finished products
– some utility facilities
Project Location : Bandar-Abbas (South of Iran)
SEP Scope of Work : Project Management Consultant (PMC) for Engineering, Procurement, Construction and Commissioning
stages of the Project ; JV with Projects Development and Solution Company (PDSCO), www.pdsco.ir
Status : Completed